Vietnam - Long Son - Cai Mep Road, Vung Tau City & Tan Thanh District - Ba Ria Vung Tau
About this project
Development to include:
- Asphalt concrete type
- Length of road: 3.75 km
- Width of road: 23 m
- Rang River bridge 400 m
- Velocity: 70 km/h
- Pavement
- Lighting
- Drainage system & culverts
- Decorative plants
This project is sourced from BCI Asia (https://www.bciasia.com). Project ID: 72855011