Singapore - Waste Management Facility

About this project

Components include:

  • Construction of Integrated Waste Management Facility alongside Tuas Water Reclamation Plant

Building elements include:

  • Air conditioning
  • Automation system
  • Ceilings
  • Curtain wall
  • Doors
  • Flooring
  • Lifts
  • Lighting
  • Paint
  • Plumbing & sanitary ware
  • Roofing
  • Security system
  • Smoke alarms / fire detection system
  • Telephone & electrical cabling
  • Tile flooring
  • Waterproofing
  • Windows

The co-location of the IWMF with PUB’s TWRP marks the project a world’s first: never before have two large scale advance solid waste and used water treatment facilities been planned from the ground up. The plan is to develop IWMF in two phases. The first phase comprising a WTE Facility (capacity: 2,900tpd), a Materials Recovery Facility (MRF) (capacity: 250tpd), food waste treatment facility (capacity: 400tpd) and a sludge incineration facility (capacity: 800tpd) will be completed in 2024. The incineration capacity of the IWMF will increase to 5,800tpd when the 2,900tpd WTE facility under the second phase is developed in 2027.

This project is sourced from BCI Asia (https://www.bciasia.com). Project ID: 20938006