Vietnam - Bac Ai Pumped-Storage Hydroelectricity Plant
About this project
Development to include:
- Capacity: 1,200 MW
- 4 pumped-storages
- Water rising dam
- Auxiliary dam used for regulating the water lake
- Water irrigating channel
- Water irrigating tunnel
- Pressure piping
- Electricity generating plant
- Transformer station
- Transmission line
- Assignment road
- Wall, concrete
- Steel backbone
- Radiant heat detach system
This project is sourced from BCI Asia (https://www.bciasia.com). Project ID: 86162011